Project Specs


Size:

90,300 sq. ft.

Components:

Class 10 cleanrooms for production; Class 10,000 space for support areas; centralized functions common to separate production lines; gravity-based drainage system to a lower level for chemical waste and hazardous materials collection and processing; exterior subgrade stormwater storage and treatment system minimizing open water in an airport approach zone

Completion:

2012